Fitness Vega

Fitness Vega - Ishraq Energy
Fitness Vega - Ishraq Energy
The 2 MWp project is expected to cover all the electrical needs for the main 6 branches in Amman in a single location. The project will be also operated and maintained by Ishraq Energy. Plant will consist 6,083 Jinko Solar Polycrystalline panels and 34 Abb inverters. Project will be connected to the medium voltage using two Abb transformers and a full SCADA system according to the regulations.

The plant will be connected according to the Wheeling regulations and is expected to be on grid at the end of 2018. Abb is expected to provide technical support as the station is built using Abb inverters, circuit breakers, switch gear and transformers. Mounting structure will be fixed using the Ramming method to assure stability and rigidity for the entire project lifetime.

Facts:

  • DC Peak Capacity: 2,007.39 kW
  • AC Connected Capacity: 1,700 kW
  • Panels Used: Jinko Solar JKM330PP72-(Plus)
  • Inverters Used: Abb Trio-50-TL-OUTD
  • Mounting Structure: Ramming Galvanized Steel
  • DC & AC Cables: Cableco
  • Circuit Breakers: ABB
  • Transformers: 1.5 * 2MVA ABB
  • SCADA System: ORTRIS